Skip to content
Agricultural EstateSaudade

Building envelope CP-04

You subscribe a long-term right of use over an accommodation unit, under a points-based timeshare. No land is sold: the ground remains undivided under single title.

All figures shown are provisional and set by the developer.

Master plan map

Schematic plan: non-building zones and the 30 building envelopes. Use the arrow keys to move between plots.

  • Non-building zones

No plot matches the filters.

View plots as a table
Text alternative to the map, with the same information.
CodeTypeStatusGross area (m²)Elevation (m)

Subscribe a share

Choose the unit and the number of shares, identify yourself, then read and sign the four declarations. No land is bought: you subscribe a share, with a right of use.

There is no online payment. On submission the system issues a reference, holds the share for 14 days and returns the IBAN and the deposit amount. The team confirms the transfer.

  1. 1. Unit and shares
  2. 2. Your details
  3. 3. Declarations
  4. 4. Reference and deposit

No shares are available for subscription at this time.